The Umutara Community Resource and Infrastructure
Development Project (UCRIDP) was signed on the 7th of June 2000.
The project started on the 5th of December 2000.
The UICRDP is basically a ten year Project based on
the Flexible Fincancing Facility Mecanism offered by IFAD. Between
May 16th and May 28th: a 'Supervision Mission" did take place.
An intermediate or Interim Review of the project took
place in November 2003 and it was suggested that the Second phase
of PDRCIU which is going to Accompany the National Decentralisation
Process. In line with this demand of Reorganisation the following
points have been regrouped as follows:
(i)Support given to aide the decentralisation and
the development of infrastucture.
(ii) Economic transformation of the Monde Rural
/or/ the Rural communities.
(iii) The unity of the Project coordination.
|
|
Français
Le projet de développement des ressources communautaires
et des infrastructures de l'Umutara (PDRCIU) a été
signé le 7 juin 2000. Le projet est entré en vigueur
le 5 décembre 2000.
Le PDRCIU est un vaste programme de 10 ans basé
sur le principe du Mécanisme Flexible de Financement du FIDA.
Une mission de supervision a eu lieu du 16 au 28 mai.
Une revue interphase du projet a été
réalisée en novembre 2003 et a préconisé
que la seconde phase du PDRCIU soit conçue dans une logique
d'accompagnement du processus national de décentralisation
de l'état Central vers les provinces et districts. Afin de
répondre à cette nouvelle réorientation, les
composantes et sous-composantes ont été regroupées
comme suit:
(i) Appui à la Décentralisation et au Développement
des Infrastructures
(ii) Transformation Economique du Monde Rural
(iii) Unité de Coordination du projet (UCP)
|