South Rohri Fresh Groundwater Irrigation Project

IFAD Asset Request Portlet

ناشر الأصول

South Rohri Fresh Groundwater Irrigation Project

South Rohri Fresh Groundwater Irrigation Project

The area has an arid climate that makes agricultural development difficult. Existing groundwater irrigation systems have not been properly maintained, which is a further impediment to productivity. Most of the households in the area practiced subsistence farming. The main objective of the project was to increase the availability of water for irrigation and improve drainage and water management over about 152,000 ha of cultivable land. It also aimed to extend the irrigation systems to make more land productive.

Farmers reported substantial increases in yields and cropping intensity. Improvements in water management systems had a lasting, positive impact on the environment by helping prevent salinization and waterborne diseases. 

Source: IFAD

 


الحالة: مغلق
البلد
باكستان
تاريخ الموافقة
19 ديسمبر 1979
مدة
1979 - 1990
قطاع
الري
التكلفة الإجمالية للمشروع
43.48 مليون دولار امريكي
تمويل فصندوق
5.68 مليون دولار امريكي
شركاء التمويل (دولي)
Asian Development Bank 33 مليون دولار امريكي
شركاء التمويل (محلي)
National Government 4.8 مليون دولار امريكي
شروط التمويل
ميسرة للغاية
رقم تعريف المشروع
1100000033

تقارير الرئيس

تقرير تصميم المشروعات

وثائق دعم الإشراف والتنفيذ

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

Related Contents