Eastern Lowlands Wadi Development Project

IFAD Asset Request Portlet

ناشر الأصول

Eastern Lowlands Wadi Development Project

Eastern Lowlands Wadi Development Project

This area was one of the most severely affected by the war for independence, in terms of both material destruction and loss and disorganization of human life.

The project has the objective of improving spate irrigation systems, the most important agricultural development opportunity in the eastern lowlands. Specific activities include rebuilding structures for flood diversion that are used several times a year to allow water to soak deeply into the soil, to help the arable zones of Sheeb and Wadi Labka regain their status as one of the highest grain producing areas in the country.

The project will also develop agriculture and livestock production. It will improve community infrastructure by rehabilitating roads and domestic water supplies. Technical coordination will be provided to strengthen the Ministry of Agriculture’s capacity to implement similar activities in other parts of the country.

The completion evaluation report of December 2004 concluded that the achievements of the project were modest, and some activities were either curtailed or not implemented at all. Many shortcomings were attributable to the conflict situation.

Despite these difficulties, activities centred on irrigation have been successful and provide guidelines on how to implement spate irrigation schemes in Eritrea. Participation is a key factor, and people who will benefit are involved from the outset, committing themselves to taking responsibility for operation and maintenance of irrigation systems.

 

Source: IFAD


الحالة: مغلق
البلد
إريتريا
تاريخ الموافقة
05 ديسمبر 1994
مدة
1994 - 2006
قطاع
الري
التكلفة الإجمالية للمشروع
20.11 مليون دولار امريكي
تمويل فصندوق
12.68 مليون دولار امريكي
شركاء التمويل (دولي)
Belgian Survival Fund 5.29 مليون دولار امريكي
شركاء التمويل (محلي)
National Government 1.3 مليون دولار امريكي
شروط التمويل
ميسرة للغاية
رقم تعريف المشروع
1100000365
الاتصال لهذا المشروع
Abla Zehour Ms Benhammouche

تقارير الرئيس

تقرير تصميم المشروعات

وثائق دعم الإشراف والتنفيذ

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

Related Contents