New Halfa Irrigation Rehabilitation Project

IFAD Asset Request Portlet

ناشر الأصول

New Halfa Irrigation Rehabilitation Project

New Halfa Irrigation Rehabilitation Project

The New Halfa Irrigation Scheme was developed in the 1960s in the context of the resettlement of people who were displaced when Lake Nasser was formed. In later years, cultivation in the area had been declining and the scheme was increasingly failing to meet production demands. The rehabilitation project set out to increase sustainable agricultural production through the efficient use of available land, water and human resources. Some of the project’s aims included:

  • strengthening the institution managing the scheme
  • establishing an agricultural training centre
  • providing credit services
  • improving agricultural production and cropping patterns
  • maintaining roads and canals

Source: IFAD


الحالة: مغلق
البلد
السودان
تاريخ الموافقة
07 مايو 1980
مدة
1980 - 1988
قطاع
التنمية الزراعية
التكلفة الإجمالية للمشروع
126.84 مليون دولار امريكي
تمويل فصندوق
13.14 مليون دولار امريكي
شركاء التمويل (دولي)
World Bank: International Development Association 40 مليون دولار امريكي
African Development Fund 10 مليون دولار امريكي
شركاء التمويل (محلي)
National Government 63.7 مليون دولار امريكي
شروط التمويل
ميسرة للغاية
رقم تعريف المشروع
1100000039

تقارير الرئيس

تقرير تصميم المشروعات

وثائق دعم الإشراف والتنفيذ

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

Related Contents