Integrated Rural Development Project/Ngozi III

IFAD Asset Request Portlet

ناشر الأصول

Integrated Rural Development Project/Ngozi III

Integrated Rural Development Project/Ngozi III

The project was implemented throughout the province of Ngozi, known for the highest population density in the country. About 90 per cent of the 150,000 smallholders’ families participating in the project had incomes below the poverty line.

The six-year project helped farmers increase the production of food crops and coffee. Fifteen new coffee washing stations were built to raise the quality of Burundi’s processed coffee and to make coffee more competitive on the international market. The programme also included reforestation, erosion control and the building of water wells and roads, as well as development of swamps for dry-season farming.  

Source: IFAD


الحالة: مغلق
البلد
بوروندي
تاريخ الموافقة
08 سبتمبر 1981
مدة
1981 - 1989
قطاع
التنمية الريفية
التكلفة الإجمالية للمشروع
26.74 مليون دولار امريكي
تمويل فصندوق
4.84 مليون دولار امريكي
شركاء التمويل (دولي)
World Bank: International Development Association 16 مليون دولار امريكي
Kuwait 3 مليون دولار امريكي
شركاء التمويل (محلي)
National Government 2.9 مليون دولار امريكي
شروط التمويل
ميسرة للغاية
رقم تعريف المشروع
1100000069

تقارير الرئيس

تقرير تصميم المشروعات

وثائق دعم الإشراف والتنفيذ

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

Related Contents