Orissa Tribal Development Project

IFAD Asset Request Portlet

ناشر الأصول

Orissa Tribal Development Project

Orissa Tribal Development Project

 

Tribal people were the primary target of this project, which included broad-based activities in natural resource management and rural infrastructure. An important achievement of the project was the survey and land settlement of the hill areas, which had been occupied by people without legal right.

The resulting sense of ownership led to a significant improvement in natural resource management, demonstrating that tribal people are willing to take up agroforestry and renounce the podu system, a specific method of shifting cultivation, if they see that the returns can be greater. The project formed the foundation upon which the Orissa Tribal Empowerment and Livelihoods Programme was built.

Source: IFAD


الحالة: مغلق
البلد
الهند
تاريخ الموافقة
03 ديسمبر 1987
مدة
1987 - 1997
قطاع
التنمية الريفية
التكلفة الإجمالية للمشروع
24.4 مليون دولار امريكي
تمويل فصندوق
12.2 مليون دولار امريكي
شركاء التمويل (دولي)
World Food Programme 1.4 مليون دولار امريكي
شركاء التمويل (محلي)
National Government 10.8 مليون دولار امريكي
شروط التمويل
ميسرة للغاية
رقم تعريف المشروع
1100000214

تقارير الرئيس

تقرير تصميم المشروعات

وثائق دعم الإشراف والتنفيذ

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

الاسيت ببليشر

Related Contents