Farm privatization project

IFAD Asset Request Portlet

Publicador de contenidos

Farm Privatization Project

Farm privatization project

The project area included six collective farms in the districts of Barda, Lenkaran, Salyan, Udjhar, Xachmas and Sharur. Most of the land is fertile and has good agricultural potential. Crop yields in the past were moderate, but productivity has declined considerably since independence, largely because existing irrigation and drainage systems have not been maintained, and because it is difficult for farmers to obtain inputs such as seeds, fertilizers and pesticides. For people raising livestock, poor animal husbandry and lack of basic sanitation and disease control have hindered productivity.

The overall goal of the project was to support the government in the privatization of six collective farms, with the aim of improving incomes and living conditions in the target area. This entailed establishing a mechanism for rapid and equitable distribution of land plots and an accurate, cost-efficient land registration system. The project also rehabilitated the main irrigation and drainage systems, helped set up water users’ associations, and developed income-generating opportunities, especially for women and landless people. Project activities included:

  • providing financial and technical support to improve agricultural productivity
  • developing institutional capacity to manage and support privatization and farm restructuring
  • helping set up local organizations to support a privatized farming community
  • developing financing mechanisms for public infrastructure and private investments
  • helping improve social services to replace those previously provided by the collective farms

The project has demonstrated that participatory irrigation management through water users’ associations provides a greater sense of ownership and ensures the sustainability of the systems.

The project also piloted an initiative to improve access to credit for farmers on the privatized pilot farms. Initially the credit programme showed low loan repayment rates, which were inadequate to ensure the sustainability of operations. But continued follow-up and supervision resulted in significant improvement in recovery rates, which exceeded 92 per cent.

The project was particularly successful in achieving its goals. The irrigation and drainage system was rehabilitated over an area of 17,116 ha, considerably more than anticipated. Six water users’ associations were set up to take over maintenance and operation of the system. Six business development centres were established to encourage off-farm job and income creation and to protect the most vulnerable people. The project provided about US$8.0 million to farmers as credit for inputs and investments. As a result farmers on the pilot farms reported marked increases in productivity.

After the completion of land privatization and farm restructuring in the target area, the government implemented the model created for the project on a nationwide basis. The project's participatory irrigation management model has also been adopted nationwide.

Source: IFAD


Estado: Cerrado
País
Azerbaiyán
Fecha de aprobación
29 abril 1997
Duración
1997 - 2003
Sector
Servicios de crédito y financieros
Costo total del proyecto
USD 28,82 millones
Financiación del FIDA
USD 9,3 millones
Cofinanciadores (Internacional)
World Bank: International Development Association USD 14,7 millones
Cofinanciadores (Nacional)
National Government USD 4,82 millones
Condiciones de financiación
Condiciones muy favorables
N.º del proyecto
1100001033

Informes del Presidente

Informes sobre el diseño de los proyectos

Documentos de supervisión y apoyo a la ejecución

Evaluación del impacto ambiental y social

Auditoría y Estados Financieros

Informe del examen interino (mitad de período)

Marco de acción para el reasentamiento

Resúmenes de informes

Resúmenes de informes

Estudios específicos

Proyectos enumerados

Auditoría y Estados Financieros

Informe de finalización del proyecto

Publicador de contenidos

Contenido relacionado